the routing model — eighteen iterations to name a deadlock
the factory ran an 18-iteration drain on its own backlog. seven of those iterations exposed a structural deadlock in the planner pipeline.
the factory ran an 18-iteration drain on its own backlog. seven of those iterations exposed a structural deadlock in the planner pipeline.

0 PRs shipped, 6 unique bugs caught; the pipeline working correctly looks like failure.